2/23/2024 0 Comments Dredging pond depFinal project costs include:ĭesign and Construction (less buffer maintenance through 2023): $985,181Įstimated Buffer Maintenance Costs (including Engineering): $33,326 The project was funded through an ad valorum levy on all watershed residents through Hennepin County. The Commission approved a final project report in September 2020. The native buffer restoration work will continue through 2023. Construction began in January 2019.Ĭonstruction began in late 2018 and was completed summer 2019. The Commission approved 50% construction designs (plans) at their meeting in April 2018 and the 90% construction plans at their June 2018 meeting. After the hearing was closed, the BCWMC officially ordered the project by resolution, and entered an agreement with the City of Crystal to design and construct the project. See the feasibility study for further details, maps, analyses, etc.Ī public hearing was held Septemto hear residents concerns and answer questions about the project. An open house and public input meeting was held in February 2017 for residents to learn more about the project and for BCWMC and city staff to hear concerns and answer questions. The Commission approved the Engineer's recommendation to dredge only Winnetka Pond (with intent to dredge Bassett Creek Park Pond in a future year) to a depth of 6 feet to install a native vegetative buffer around most of the pond, and to control the goose population at the pond. A feasibility study was completed and approved in May 2017 and included bathymetric surveys, wetland delineations, and sediment sampling including analyses for harmful contaminants in both Bassett Creek Park Pond and Winnetka Pond.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |